The maintenance log and the contingency fund study are prepared by a member of a professional order named by regulation, and inspection reports by professionals. The board then copied their content into CondoAide by hand, line by line. CondoAide now reads these documents for the board, and the board reviews them before anything is saved.
The firm's maintenance calendar, with its months
Some firms deliver the maintenance log as an Excel workbook, with a "Calendrier d'entretien" sheet laid out as a grid: one row per task, one column per month, over several years. "Import carnet" now reads that grid. The sections, tasks and frequencies arrive in the usual review screen.
The months the firm suggests in the grid are carried over to each task. A task with an ambiguous frequency, such as "Au besoin" (as needed), or with months that change from one year to the next, arrives unchecked: the board sets the interval from the log and confirms it with the firm that prepared it if needed. If the grid does not make clear which months are suggested, no month is guessed.
An inspection report becomes work orders
In Work Orders, "Import an inspection report" offers the reports already filed in the register under "Inspection reports". Currently read: some facade or multi-level parking verification report templates, and the annual fire alarm system inspection report (CAN/ULC-S536).
CondoAide extracts the recommended work, grouped as in the report: by priority ("Priority 1 · 0 to 2 years", and so on), or as deficiencies, recommendations and untested devices for a fire alarm report. Each line links to its page in the PDF, and the professional's report remains the reference.
- The reference date. Due dates follow the report's priority periods, counted from this date. When the report gives more than one date, the board chooses the one to use.
- A suggested component. Each line proposes a component from the inventory, with the reason for the suggestion, such as "Suggested from the finding's description". The board keeps it, changes it or leaves the line without a component.
- Findings to monitor are kept with the report, without creating a work order.
- The next inspections the report states are added to the maintenance log only if the board checks them with "Add to the logbook" and links each one to a component.
- A report restricted to some members in the register is flagged: the work orders created from it will be visible to everyone with access to work orders, so the board unticks the lines that should not be.
The new work orders land in the "Backlog" column. On each one, "Inspection report, p. 12" opens the PDF at the right page.
Undo an import
An unwanted import can be undone with "Undo the import", right away or later. When the board is filtered on the "Inspection" source, the "Imported inspection reports" list shows each imported report, who imported it and when, with its undo. Undoing removes the work orders, findings and inspections taken from the report; the report stays in the register. Undo is no longer offered once one of the work orders has been started or changed, and the list says why.
The inventory, section by section from the study
When the contingency fund study files its interventions by section (for example 1.1.1), "Create from the contingency fund study" builds the inventory from those sections. If the study's component list has not been read yet, "Read the component list" takes it from the study PDF, without touching the inventory.
For each existing component, the board chooses:
- Link it to a study section: it keeps its history (maintenance, work, documents, photos) and takes the section's name and data.
- "Keep as is": it is not changed.
- "Archive": it leaves the active inventory, but keeps its planned maintenance and open work orders, which stay active.
Each row shows what the component already carries, so two components with the same name can be told apart. Before confirming, CondoAide sums up what will be created, updated, archived or left unchanged. "Build the inventory" applies the choices, and the operation can be undone right afterwards, archives included.
The study import also keeps each intervention's reference number, shown in the import preview and in the work plan.
The work orders board
- Several work orders at once. "Select", a card's checkbox, Shift-click or a column's checkbox pick several work orders. A bar then changes their "Stage" or "Priority", or deletes them. Delete is meant for work orders created by mistake, such as a duplicate import; a work order tied to records the syndicate keeps (an expense, documents, a claim) stays on the board.
- Filter by stage. The "Stage" filter shows only the chosen columns: "Backlog", "In Progress", "To confirm", "Done". A cancelled work order counts as "Done".
- Search with Cmd+F or Ctrl+F. On the Work Orders page, the shortcut opens the board search, which covers every work order, including those off screen. A busy board also displays faster.